Commissioned by JYSK, Willy Naessens Nederland, together with Vrolijk Groep, has realized the new distribution center in Lelystad.
Covering approximately 147,000 m², this distribution center includes, among other things, a high-bay warehouse with 166,000 pallet spaces, 21 cranes, and no fewer than 137 loading docks. An impressive project, and this location therefore serves as a logistics hub for JYSK.
Curious? Read on and watch the video!
As the installation partner for this project, B&V Techniek chose solutions from Niedax Group.
One of the challenges was the scale of the project, involving more than 10,000 meters of cable support systems (from Niedax Nederland and Gouda Holland) and the universal mounting system Niedax STRUT (for, among other things, attaching the busbar system).
To ensure everything runs smoothly, transparent communication and close collaboration with all parties (from the installation partner and assembly company to the electrical wholesaler) are a crucial component for the success of the project.
Curious? Take a look and let Joost Sanders and Mark van der Pol inspire you with this fantastic project.
Our experts are happy to assist you!
Niedax Kleinhuis – the specialist in cable support systems.